And the review determined that the two affected beams, both over 60 feet long, barely moved an inch due to the fractures. The redundancies in design guaranteed the beams’ stability. The overall safety of the building was never compromised. If those workers hadn’t discovered the cracks by chance, we still might not know about them.
Source: Salesforce Transit Center: San Francisco’s $2.2 Billion Cracks